Views: 8 Author: Site Editor Publish Time: 2015-10-20 Origin: Site
Reducer is a common power transmission mechanism, has applications in a variety of mechanical transmission system. The installation and use of the reducer is directly related to the operating results of the reducer, to comply with the technical specifications and standards. Reducer
1.reducer during installation, to pay special attention to the pair of drive center axis, the error can not be more than reducer coupling compensation amount. Reducer in accordance with the requirements in, you can get a better transmission effect and longer service life.
2. the output shaft of the reducer in installing transmission parts, must pay attention to the operation of the soft, prohibit the use of a hammer and other tools gross installed, it is best to install assembly fixture and end the internal thread of the shaft, the strength of the bolts into the transmission parts into the reducer, which can protect the internal parts reducer will not be damaged.
3.Reducer coupling with a variety of optional type, it is best not to use steel fixed coupling, such coupling is more difficult to install, once installed properly it will increase the load capacity, likely to cause bearing damage, and may even cause the breakage of the output shaft.
4.Reducer fixed is very important to ensure a smooth and solid, in general, the reducer should be installed in a horizontal foundation or base, behind the oil tank at the same time should be able to exclude, and the smooth circulation of cooling air.Gearhead fixed bad, unreliable basis occurs caused by vibration and other phenomena, also makes unnecessary damages to the bearings and gears.
5.Reducer transmission couplings member when necessary, the installation of protective devices, such as coupling projections or gear, sprocket, if the output shaft is subject radial load, but also should be selected enhanced.
6.Reducer installation location to ensure that the operation of the staff, including the ability to close the cursor, ventilation plug and drain plug location. Reducer installation is complete, the inspectors should be comprehensive in order to check the accuracy of the installation location, to determine the reliability of each fastener.
7.reducer before running, but also ready for operation, the oil tank vent plug to be removed to replace the vent plug, open the height of the oil level plug screw check the oil line, add the oil more than the oil level plug, screw hole overflow, and then tighten the oil level plug and make sure to correct, you can start trial operation.
8.gearhead test run time can not be less than two hours the functioning standard, smooth running, no vibration, no noise, no leakage, no impact, if the abnormal situation should be immediately removed.